EV Charger Installation
Professional Level 2 EV charger installation for your home or business. Properly sized circuits, code-compliant work, and permit handling included.
How it works
Site Assessment
We evaluate your electrical panel capacity, charger location, and circuit routing. If a panel upgrade is needed, we'll provide a clear estimate.
Permit and Scheduling
We pull the required electrical permit and schedule your installation at a time that works for you.
Circuit and Charger Installation
We run the dedicated circuit, install the breaker, mount your charger, and make all connections to code.
Inspection and Testing
We coordinate the municipal inspection, test the charger with your vehicle, and walk you through operation.
Common questions
Do I need to upgrade my electrical panel?+
It depends on your current panel capacity and available breaker slots. We perform a load calculation during the site visit. Many newer homes with 200-amp service can add a charger without an upgrade, but older 100-amp panels often need one.
How long does charging take with a Level 2 charger?+
Most EVs gain 25 to 30 miles of range per hour on a 40-amp circuit. A typical overnight charge fully replenishes your battery. Exact times depend on your vehicle's onboard charger and battery size.
Can you install the charger outdoors?+
Yes. We use weatherproof enclosures and NEMA-rated components for outdoor installations. The charger itself must be rated for outdoor use—most modern units are.
Get started — Atlantic City, NJ
Get it wired right, the first time.
Tell us what's going on and we'll take a look — honest assessment, upfront pricing, no obligation.
Power out or something dangerous? 24/7 Days a Week Emergency Service


