Emergency Generator Install
Professionally installed standby generators that automatically restore power during outages. Sized, wired, and permitted to keep your home running when the grid goes down.
How it works
Site Assessment and Load Calculation
We evaluate your electrical panel, fuel source, and placement options, then calculate the generator size needed to power your essential or whole-home loads.
Permit and Equipment Ordering
We pull electrical and gas permits, order the generator and transfer switch, and coordinate delivery and any fuel line work with your utility or propane provider.
Installation and Wiring
We pour or prepare the pad, set the generator, install the transfer switch, run conduit and wiring, and connect the fuel line.
Startup, Testing, and Inspection
We start the generator, test automatic transfer under simulated outage conditions, and schedule the final inspection. Once approved, the system is live.
Common questions
How long does a generator installation take?+
Most residential installs take two to three days once permits are issued and equipment arrives. Permit approval and equipment lead times vary, so plan for four to eight weeks from contract to completion.
Can I run my whole house, or do I need to pick circuits?+
It depends on your load and budget. A whole-home generator costs more up front but powers everything. A smaller unit can cover essentials like heat, refrigeration, and a few outlets. We'll walk through both options during the estimate.
Do I need to do anything when the power goes out?+
No. The generator senses the outage, starts automatically, and the transfer switch shifts your home to generator power. When utility power returns, it switches back and the generator shuts down. You'll hear it start, but you don't touch anything.
Get started — Atlantic City, NJ
Get it wired right, the first time.
Tell us what's going on and we'll take a look — honest assessment, upfront pricing, no obligation.
Power out or something dangerous? 24/7 Days a Week Emergency Service